Channel Islands Harbor Peninsula Revetment Repair Project

Owner: County of Ventura Harbor Department

Project Location: Channel Islands Harbor, Oxnard, California

​

This project involves the repair and replacement of the rock revetment located around the south end of Peninsula Road in Channel Islands Harbor. The project includes removal of existing armor stone and soil, re-grading the existing slope to a 1.75 (horizontal):1 (vertical) slope using 3/4" crushed rock, installing filter fabric to assist in stabilizing the slope, and placing approximately 8,700 tons of new 1/4-ton armor stone over the reshaped stablized slope. Construction will generally occur from elevations of approximately -12 feet relative to the North American Vertical Datum of 1988 (NAVD88) to +11 feet, NAVD88.