top of page
Berths 302-305 On-Dock Railyard Expansion
Owner: Port of Los Angeles
Project Location: San Pedro, California


Project Scope
This project consists of installing 5 new rail tracks (approximately 12,000 linear feet); grading and paving; drainage; fencing; steel casing; sewer; waterline relocation; fire protection; electrical improvements; and striping and signage. The trackconsists of 136 pound continuously welded rail (CWR) on concrete ties, timber ties, ballast, and subballast. The on-dock railyard expansion also includes powered turnouts, manual derails, track bumpers, and expansion of the existing train-in-motion system. The project involves utilizing the existing compressed air building and constructing new compressed air pits.

Berth 100 3

Berth 100 3
1/1
bottom of page